STEP 1
AEROVISTA LOCAL · EARLY SITE FEASIBILITY
Find the constraints before they become redesigns.
Enter the lot facts you know. LotScope turns setbacks, coverage, project size, garages and access into a fast feasibility screen with plain-English concerns and next checks.
STEP 2 · EARLY FEASIBILITY
RUN THE ASSESSMENT
Adjust the assumptions above, then run the assessment. Nothing here is sent to analytics as an address or parcel identifier.
CAPABILITY ROADMAP
This starts as a calculator. It grows into a site-planning assistant.
Dimensional feasibility
Setbacks, coverage, unit size, stories, garages, access width and plain-English constraint flags.
Jurisdiction + parcel facts
Address/parcel lookup, zoning district, allowed uses, official code citations, frontage, parking and source timestamps.
Geometry + circulation
Irregular lot shapes, driveway adjustment, garage door placement, turning paths, two-building placement, pass/fail geometry and alternative layouts.
Visual site-fit engine
Drop conceptual footprints onto a lot, compare schemes, explain why one layout works better and preserve an auditable chain from source rule to design constraint.
SOURCE STANDARD
No invented zoning answers.
When automatic jurisdiction data is added, every rule that affects the result should carry its source, effective/verified date and confidence. If the source is unavailable or ambiguous, the app should say Needs Verification instead of guessing.